- slag-water waste heat usedMCC Capital Engineering report
- 65GWh / yr
- direct CO₂ reductionMCC Capital Engineering report
- ≈ 20,000t / yr
- standard coal savedMCC Capital Engineering report
- ≈ 7,500tce / yr
- continuous stable operation since April 2022MCC Capital Engineering report
- 3+years
- energy-saving subsidy secured in H1 (about 20%)Company-reported
- ≈ CNY 18 M
- payback on CNY 30 M+ investedCompany-reported
- 3years
China's first complete slag-water LiBr cooling-and-heating application. System, materials and equipment supplied by us under our own patents; MCC Capital Engineering as EPC contractor. Featured on CCTV's Great Construction, season 2. Phase two under way.